Path to be widened
Good news the main path through Bigwood is to be widened and brought up to DDA standard.
The 300 metre length from the slipway to the first culvert will be widened to 3 metres and the steep slope either side of the culvert will be reduced, this work is anticipated to start in the autumn 2008.
|